Minipack Torre Mv31 Pump Manual



The MiniPack MVS 31X vacuum packing system is a chamber style vacuum machine. A commercial vacuum packer that is small enough to fit into a home kitchen. A nice SousVide choice, also popular with sportsmen for the ability to change the depth of the unit with multiple plates.

The next video gives a brief description of the new MVS31X the new changes and style. The unit comes standard with a cut off wire and heat wire for poly bags. If you are looking for a unit to use with retort canning or mylar bag sealing the MVS31X still lends it's self for this application but does need to be upgraded with a heavier duty heat bar by PMG for this function. This is not a factory upgrade exclusive only via PMG.

The shorter chamber size evacuates a bit faster. However sealing larger bags for items such as roasts or whole chickens the chamber is a bit small in the new MVS31X. We recommend the larger chamber of the Sammic 310S for home or commercial applications that have a need for a larger item to be vacuum sealed. The overall foot print of the two units is approximately the same but the chamber size in the Sammic is several inches longer, giving it more room for larger items.

Busch 7 Meter Rotary Oil Pump for a fast cycle time and quick air release making this a higher production unit the MiniPack MVS26.

Minipack America Parts & Manuals minipack America is a leader in vacuum sealing, bagging, and packaging equipment for a myriad of industries. For foodservice, minipack America manufactures vacuum sealers for sous vide cooking, tray sealers, bagging systems, and much more. Pump Type: Busch Oil Rotary: Cycles per Minute. up to 3: Free Air Displacement: 8 m³/h: Pump Power Rating: 0.50 hp: Power Supply: 120V / 7.5A.

Programmable features give you 9 flexible cycles to extract just the right amount of air for what you are packaging.

Manual

Chamber size - 12.75' Wide x 11.75' Long x 4' deep Single Heat Seal Bar Across the Front 12.25'

Over all Foot print 16' x 19' Stands 14' height

Available options: Custom Heat Seal Bar ConfigurationsOur MiniPack MVS31X has a cutoff wire standard and can be replaced with a second heat wire for home packing this option will give you a more secure seal and a must for retort canning.

Gas Flush SystemGas Flush Option can be added at the time or order. Gas flush feature is used for products that need the air removed from the bag, but are delicate in nature not wanting the tight squeeze of the bag caused by vacuum packing. The gas flush option allows for the operator at a touch of a button to go from traditional vacuum packing to gas flush, the bag is injected with a nitrogen, or combination of gases to give the bag a pillow effect but be void of oxygen. A great Feature for pastries and or some vegetables will stay fresh and crispy but not crushed. This option is rarely used on meats with the exception of fresh Tuna as it enhances the color without harmful ingredients and dyes. We suggest PraxAir for your gas supplier, as they are experts in the field for proper amounts of gas and the food you are working with.

Liquid TrayThe Optional Liquid Tray will slope the chamber to seal bags of liquid like sauces.

220 volt available with special order

The MVS-31X vacuum machine will handle bags up to 12' x 14' and is designed for operations that need a high quality vacuum packer for portion control, pre-made soups, stocks or sauces, private label products, or production packaging of perishable products.

Product sealed with a commercial Vacuum packer will extend the life of refrigerated or perishable product by 3-5 times the normal shelf life and eliminate freezer burn. Commercial vacuum-sealed product prevents shrinkage-- the weight you pack is the weight you sell. This feature allows you to buy bulk product and repackage for more profit, and to work ahead during slow periods. The MiniPack MVS-31X vacuum packing system is a medium duty, lite capacity commercial or industrial vacuum packer.

A good size for a home kitchen and a great machine if you are looking to replace a suction style you will see a noticeable better quality vacuum and the bags are less expensive than the textured bags as well as a wide variety such as the retort, Mylar, gold/clear foil, 3 mil-4mil and 5 mil bags can be used with the MiniPack America MVS31X.

The MVS-31X has a 12.25 heat bar that lets you put two 6' bags side by side or the largest bag the MVS-31X will handle is 12' x 14'. The MiniPack MVS-31X is a favorite machine with delicatessen counters and smaller meat markets.

MINIPACK AMERICA MVS-31X FEATURES:

12.75' x 11.75' x 6' Chamber

One 12.25' Single Seal Wire With a Cut off Wire on the Heat Bar

.25 hp Rotary Oil Pump

Adjustable Vacuum up to 29.95' Hg

20 Second Cycle Time

Power 110V 9 Amps

Machine weight 100 lb. on a pallet Shipping Weight: 120 lb.

Over All Dimensions: 16' x 19' x 14'

Dome Lid

BUILT IN ITALY MiniPack America offers a 1 year limited warranty not including wearable parts. The MiniPack America commercial vacuum sealers are our medium duty line of chamber sealers. A mid range price point the MiniPack line of vacuum packers is good quality that holds up well under moderate daily use.

For custom order requirements: Please call 800-227-3769

Ark survival evolved unblocked. PMG will match or beat any currently authorized distributors advertised price.

  • Vacuum Bags & Shrink Film
  • Vacuum Sealer FAQs
    • Table Top & Floor Model Chamber Vacuum Sealers
      • Programming
    • Double Chamber Vacuum Sealers
  • Replacement Parts
  • Orders, Payment, Shipping & Returns FAQs
  • Documents

Vacuum can be started up quiet easily from just a small touch from the lid to the micro-switch, to adjust the lid. Loosen up screws from the back of the lid on both the left and the right side.

The display fuse on an MVS 45 is located on the side of the contactor labeled QM2.

Many applications being used contain liquid when vacuum sealing inside the chamber. We always recommend that an angel tray kit for liquids is used.

To assist in keeping these liquids from entering the bladder, we have added 2 'O' Rings to the bushing.

These 'O' Rings serve as a gasket to help protect the bladder. A photo of the new style bladder bushing can be found below.

A clog in the oil cooler or oil tubing, prevents the proper circulation and can cause many problems.

To determine if there is a clog, check the temperature at the oil tubing coming from exhaust box, down the back end to the round oil cooler.
The temperature taken at the oil tubing should be about the same (+- 10 degrees) as the temperature measured at the side of the exhaust box.

If there is a big difference in the 2 temperatures, it may indicate there is a clog.

1. Lid switch or start button starts the vacuum cycle.
2. Control board sends signal to the vacuum pump to start pulling out all the air from the chamber.
a. The air release valve (normally closed setup) is opened to the vacuum pump and closed to the
atmospheric pressure.
- this is to ensure the final vacuum pressure is attainable
b. The seal valve (normally closed setup) is closed to the atmospheric pressure and open to the vacuum pump.
- this is to prevent the seal bladder from pushing the seal bar upward and pinching the bag
3. Vacuum sensor on control board receives final vacuum pressure and control board sends stop signal to
vacuum pump.
4. Control board sends out signal to seal valve and seal transformer for the set seal time.
a. Seal valve receives signal to open to the atmospheric pressure and pressure difference pushes bladder up and raises seal
bar against seal cushion.
b. At the same time seal transformer receives signal and energizes the seal wires to seal the bag.
5. Control board sends signal to air release valve to open to atmospheric pressure.
a. Pressure in the chamber and outside equalizes; spring in bladder retracts to bring seal bar down
Lid can be opened.
6. Control board sends signal to air release valve and seal valve to close for the next vacuum cycle.

Download: MVS 45 Series - Lid Shocks Replacement (pdf) »


Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

Minipack Torre Mv31 Pump Manual Transfer Switch

Download: MVS Solenoid Valve Testing (pdf) »

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

1. If the machine is not equipped to receive gas and the gas function is programmed, the machine will not work. The gas flush function light will blink continuously until it is reset to zero.
2. Gas or gas mixture must be regulated between 15 to 60 psi before connecting to the gas inlet on the machine.
3. The higher the pressure, the higher the force or velocity of gas will come out of the nozzle. High pressure can move the bag from the nozzle or the sealing bar or cause the bag to be crooked on the seal bar.
4. If bag contains powdery substance, the gas injection may cause the powder to expand and over flow out of the bag and into the chamber.
5. Gas flush function can be set from program P1 through P8 on the MVS X series machine.
6. During programming mode, each light will light up to accept the programming.
a. Vacuuming – picture with arrow pointing out of the package( left most LED light on the keypad)
b. Extra vacuum – using the same picture with arrow pointing out of the package
c. Gassing – picture with arrow pointing into the package
d. Sealing – picture of 2 triangles on top of each other at opening edge of package
e. Air release – picture of arrows pointing toward outside the package (right most LED light on the keypad)
7. The vacuum % must always be higher the gas %.The residual vacuum % between vacuum % and gas % should be higher than 60%. This is to ensure proper sealing of the package.
8. Example 1.
a. Vacuum 99.9%
b. Gas 40%
c. Residual vacuum = 99.9 – 40 = 59.9%
9. Example 2.
a. Vacuum 75%
b. Gas 15%
c. Residual vacuum = 75 -15 = 60%
10. Over-gassing will only waste the gas inside the chamber. Choose the lowest gas % possible to give the best pillow effect of the package.
11. Nozzle should be inside the bag and the bag holder under the lid should be over the nozzle. This will ensure the bag is pinched between the holder and the nozzle when the lid is closed.
12. The bag should also lay flat with no wrinkle and no fold-over on the seal bar for a good seal.

Download: Gas Kit - Important Notes (pdf) »

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

Download: 3 Phase Machine Installation (pdf) »


Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

MVS 26X / 26XII


MVS 31X


MVS 35X

Torre

MVS 41X


MVS 45X / 45XII


MVS 52X - 120 Volt


MVS 52X - 208 Volt


MVS 52X - 220 Volt

MVS 31XP


MVS 35XP


MVS 41XP


MVS 45XP / 45XPII

Mv31

MVS 52XP - 120V


MVS 52XP - 208V


MVS 52XP - 220V

If the air is not returning to the chamber at the end of the cycle, please check the following if you are a certified technician or electrician:

1. On the keypad, does the fourth LED light come on when air is supposed to be returning to the chamber?

If no, it is more than likely your control board.

If yes, the possibilities include:

Check the connection from, control board to wire harness.

Check the 2 wires that go to the air release solenoid as they should measure 120V.

If they are not measuring at 120V, control board is more than likely the issue.

If they do measure at 120V, check voltage at the solenoid connector, make sure it measures 120V.

If the voltage at the solenoid connector does not measure 120V, possible bad connector or loose wire.

If the voltage at the solenoid connector measures 120V, check the devac valve solenoid by hot wiring directly with 120V power.

If it engages the valve, the valve is good.

If it does not engage the valve, the valve and solenoid need to be replaced.

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

On all MVS floor model series (50, 52-208v and 65) lines are numbered L1, L2 and L3.

For all 3 phase MVS floor model series, connect high/wild leg to LINE 3.

Manual

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

1. Check oil and filter. Not regularly changing your oil can negatively affect the way in which your pump runs.

2. Check that safety switches have not been triggered. If you can push in any of the buttons underneath the front right corner of the machine back up, this means one of them has been triggered due to a power issue.

3. Make sure there is a set value in the vacuum percentage in the program you are using.

4. If there are lights blinking on your display, more than likely you have programmed gas. Make sure if you are not using inert gas and that the values displayed are 0.

5.Manually press on the micro lid switch on the back of the chamber to see if that is the issue.

6. Try to recalibrate the machine.

For technicians-

Check microswitch, contactor, all connector wires, control board, and fuses(both on the control board and at fuse box).

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

Download: MVS Bladder Continuity Test (pdf) »

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

First and most importantly. the gas pressure must be regulated before connecting to the machine.

Operating pressure is between 15 to 25 psi.

Maximum pressure is 58 psi.

The gas pressure must be constant at the machine.

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

1. Turn power off and unplug machine.
2. Remove body rear panel and disconnect microswitch
wire at the connectors.
3. Carefully remove left and right shock-to-lid screws
(Lid will rest in the groove)
4. Remove left and right lid hinge screws.
(Top hinge block set screws might have to be loosened to ease hinge
pins removal.)
5. Stand behind machine, while carefully holding and
balancing the lid, remove left and right hinge pins.
6. Carefully lift the lid away from the hinge blocks.
7. Remove left and right body-to-tub screws.

8. Pull out the sealbars.
9. Pull out the white bushings.
10. Carefully loosen and remove lock nuts.
11. Bladders will drop down.

(Make sure to save the o-rings.)

12. Carefully lift tub out of body and place
support between tub and body.
13. Loosen hose clamp and slide hose off
elbow.
14. Remove the hinge blocks from tub.
(Please note the orientation of blocks before removal.)
15. Remove the lid shocks.
(Please note orientation of shocks before removal.)
16. Remove microswitch bracket.
(Please note orientation and height of
microswitch before removal)

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

1- Turn off machine and unplug from outlet.
2- Remove left and right tub-to-body retaining screws (left and right side edges of the tub).
3- Lift the tub out of the body and rest the tub on blocks of wood.
BE CAREFUL because tub is heavy and top edges of body is sharp.
4- The micro-switch is at the rear left side of the tub.
5- The microswitch is mounted on a bracket which is held by 2 screws to the body of the tub.
6- Before removing the old microswitch, please observe the height of the switch in reference to the opening
on the mounting hold. This is to determine the engagement distance between the bottom of the lid and
top of the micro-switch.
7- Disconnect the 2 lead connectors and remove the old micro-switch.
8- Install the new micro-switch. Check the engagement distance of the micro-switch. It should engage when
front of the lid is about 2 to 3 inches before closing completely. Adjust the height as necessary.
9- Reconnect the micro-switch connectors, plug machine into power outlet and turn on machine. Close
the lid and make sure the cycle starts when the switch is engaged at 2 to 3 inches before lid closes to the
tub. Readjust microswitch height as necessary.
10- Carefully place tub back into the body and reinstall the tub-to-body retaining screws.

Our advice is stricly limited to the question(s) asked and is based on the information provided to us. Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

Important Notes:

  1. Gasket is shipped at a slightly longer length than needed. A final trimming must be done to ensure proper lid seal.
    See download below for installation procedures.

    Approximate shipping lengths:
    MVS 31X / 31XP = 45 inches
    MVS 41X / 41XP = 73 inches
    MVS 45X / 45XP = 69 inches
    MVS 45XII / 45XPII = 69 inches
    MVS 45LXII / 45LXPII = 69 inches
    MVS 48 / 48DV = 86 inches
    MVS 50X / 50XP = 94 inches
    MVS 65X / 65XP = 108 inches

  2. DO NOT pull or stretch the gasket to ease the installation of the gasket into the groove.
    Gasket will stretch during insertion due to narrowness of the groove in the lid.
    The narrow groove will ensure gasket stays in place.

  3. DO NOT use any kind of powder, lubricant or glue to install the gasket.

Download: MVS Lid Gasket Installation (pdf) »

Our advice is stricly limited to the question(s) asked and is based on the information provided to us. Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.


In cold environments, the oil becomes heavy, causing the amp pull to become higher.

We suggest to increase the breaker to an 18 AMP breaker.

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.

Moisture working its way into the bladders is what can create the majority of issues that lead to bladder replacement.

Minipack Torre Mv31 Pump Manual Instructions

Minipack highly recommends to use an angled tray for liquids to prevent these issues from occurring and decrease oil contamination. Order an angled tray for liquids today to prevent bladder issues.

Other possible issues:
The sealing bar on the machine has one of the following symptoms:

  • Loss of continuity
  • Loss of bag vacuum
  • Inconsistent sloppy seal
  • Raises unevenly
  • Lacks contact with red lid cushion

Important: The following instructions to be performed by Certified Technicians only!

Estimated bladder removal and bladder rebuild time: 1.5 hrs per sealing bar
(We recommend rebuilding all bladders per sealing bar at the same time)

Tools needed:

  • Phillips screwdriver
  • Pliers
  • 2.5mm allen wrench
  • 7mm socket
  • Heat gun
  • Loctite
  • Acetone
  • Clean cloth

Step 1: Remove bladder

  1. Disconnect vacuum hose and electrical transformer from bottom of the bladder and remove the locking nut inside the chamber that holds the bladder in place.


Step 2: Disassemble bladder

Minipack Torre Mv31 Pump Manual Transmission

  1. Use pliers or vice grip to tightly grip steel post against the white bushing to keep spring inside from releasing too fast.
    Caution: Spring is in tension!
  2. With a Phillips screwdriver carefully remove all (8) screws that hold the upper and lower body of the bladder together.
  3. Slowly separate the two bodies from each other, and remove spring between them.
  4. Remove old bladder gasket. Use a clean cloth and Acetone to clean all parts of the bladder.


STEP 3: Reassemble bladder

  1. Replace gasket

    Align the holes of new gasket with notches on lower bladder body.
  2. Replacing the inner wire

    1. Loosen thread locker by using heat gun to heat bottom section of metal post on center disk.
    2. Grip the metal post on the bottom side of center disk with pliers. Use 2.5mm allen wrench to loosen and remove screw on back side of disk. Remove old inner wire and replace with new inner wire.
    3. Install metal post on disk by applying some Loctite on half of the screw (section closest to screw head). Tighten screw as much as possible.
    4. Use the 7mm socket to loosen and remove screw on upper bladder body. This will also remove the locking nuts and washer on top of upper bladder body. Replace wire and re-apply locking nuts.
    Apply washers/nuts in this order from bladders piece up: locking washer, locking nut, wire, locking washer, locking nut as in photo 3b-4 below.

  3. Assemble bladder body

    1. Set 4 screws into lower bladder piece in 'x' formation ready to be inserted into upper bladder body (photo).
    2. Set coil on metal post. Insert metal post into upper bladder body, and white bushing on top over metal post.
    3. Push center disk upwards and tightly clamp metal post against white bushing with pliers to keep spring tight.
    4. Connect upper and lower bladder bodies together by carefully aligning marker strips located on their sides, and quickly screwing in the 4 screws. Insert other 4 screws and tighten.
    Apply 10 lbs of pressure on locking nuts when installing bladder back into chamber of machine.

Bladder Shaft (removal & installation)

1. Remove bladder assembly from chamber

Minipack Torre Mv31 Pump Manual Online

2. Carefully split the top portion of the from the bottom part. *note: refer to document 'how do I rebuild the bladders?'

3. Hold the bladder shaft with a locking plier

4. Heat the shaft witha heat gun (not a torch) on high for 30 seconds.

5. Carefully loosen the screw with a 2.5mm/hex wrench

6. Install new shaft & inner wire onto disk. Note: use a drop of lock-tight glue on tip of screw before inserting into shaft.

Minipack does not assume any responsibility or liability for the advice given and shall not be liable for any direct, indirect, special, incidental or consequential damages in connection with the use of this information.